Barn Progress, Part 3
Warning: picture heavy post ahead! As an extra bonus, something you don’t see on my blog very often: dogs.
We are having a very mild Winter here in Washington. It’s still been very rainy so we take advantage of every sunny day we get. This weekend (and days on each side of the weekend) we’ve had gloriously sunny weather with a high in the 50′s and lows around freezing.
Saturday started with evening up the truss ends and building the lookouts (all of these things create the eves on the outer walls of your building), attaching fascia board, and finally sheeting half of the roof. At the end of the day the crew moved around to the opposite side of the building and got the fascia on, as well as the lookouts. With the prep done, it only took half a day Sunday to sheet the back side. After that it was quick work to roll out the tar paper.










All this work was done with an all volunteer crew of family, friends, and neighbors. I don’t help much with the building aspect, but later on R will help with projects at all of their houses (as he has also done in the past). My main job for the weekend was fetching food/drink, and keeping an eye on the dogs. Shown above is Logan who is 3 years old and Ziva who is 5 months. Logan is *really* gentle, but he’s big so it took an hour before Ziva was comfortable playing with him.
February 22nd, 2010 at 12:31 pm
Looks great – and also looks like you had fantastic weather! Not so much here.
February 23rd, 2010 at 8:34 am
Great pictures. The barn is HUGE!